+86-13823552541

Installation Guidelines For Stone Lights

Aug 14, 2026

Foundation Preparation: The concrete base must be at least 20 cm thick, and embedded parts require anti-rust treatment.
Cable Installation: Use VV-3×2.5mm² cable; route it through PVC conduit and bury it at a depth of at least 50 cm.
Maintenance Schedule: Clean moss from the stone surface and inspect the electrical circuit's sealing every six months.

Send Inquiry